Cosentino Flagship Project

A Dekton-cladded robotic plant

Domus Arquitectura – Paz Fernández Ovejero

ONCE  - Unidad Central de Preparado ONCE 05 45

Lokalizacja

Madryt, Hiszpania

Material

Dekton

Kolor

Soke | Soke Grip | Lunar | Keyla

Quantity

300 m2

Architecture / Design

Domus Arquitectura – Paz Fernández Ovejero

Application

End date

2019

Grubość

12 mm

Innovation begins with the surfaces

ONCE  - Unidad Central de Preparado ONCE 13 47
ONCE  - Unidad Central de Preparado ONCE 12 49

Customised cuts to ensure visual continuity

Do you need help with a project?

Do you need help with a project?

“On the walls, for the assembly of Dekton's pieces, we rely on large formats and lighting reflections to seek continuity”
Domus Arquitectos

Domus Arquitectos

Industrial functionality embracing design

ONCE  - Unidad Central de Preparado ONCE 36 52

Cosentino’s materials used in this project

Soke

Soke

Dekton
lunar_close_up

Lunar

Dekton
kelya

Kelya

Dekton

Related case studies

.

ONCE  - KSK Rottweil Schlater3 31

Kreissparkasse

ONCE  - Unidad Central de Preparado ONCE 05 33

ONCE

ONCE  - Bernardus golf and memories Restaurant Noble Kitchen Cromvoirt 6 35

Bernardus

ONCE  - Dekton Wall 1 37

The wall

ONCE  - clubhouse 1 39

Tenah Merah

ONCE  - Auchan Dekton 32 41

Auchan

ONCE  - One South 1 43

One South County

ONCE  -  54

Do you want to know the possibilities of Dekton in facades?

ONCE  - arrow right circulo@3x 1 56

Skontaktuj się z nami

Jeśli chcesz otrzymać bezpłatną próbkę lub profesjonalną poradę, wypełnij formularz.