Cosentino Flagship Project

A Dekton-cladded robotic plant

Domus Arquitectura – Paz Fernández Ovejero

ONCE  - Unidad Central de Preparado ONCE 05 51

Location

Madrid, Espanja

Material

Dekton

Väri

Soke | Soke Grip | Lunar | Keyla

Quantity

300 m2

Architecture / Design

Domus Arquitectura – Paz Fernández Ovejero

Application

End date

2019

Paksuus

12 mm

Innovation begins with the surfaces

ONCE  - Unidad Central de Preparado ONCE 13 53
ONCE  - Unidad Central de Preparado ONCE 12 55

Customised cuts to ensure visual continuity

Tarvitsetko apua projektin kanssa?

Ota yhteyttä asiantuntijoihimme saadaksesi neuvoja

Tarvitsetko apua projektin kanssa?

Ota yhteyttä asiantuntijoihimme saadaksesi neuvoja

“On the walls, for the assembly of Dekton's pieces, we rely on large formats and lighting reflections to seek continuity”
Domus Arquitectos

Domus Arquitectos

Industrial functionality embracing design

ONCE  - Unidad Central de Preparado ONCE 36 58

Cosentino’s materials used in this project

Soke

Soke

Dekton
lunar_close_up

Lunar

Dekton
kelya

Kelya

Dekton

Related case studies

.

ONCE  - Bank of Buffalo 32 31

Bank of Buffalo

ONCE  - Nippon Express 6 33

Nippon Express

ONCE  - Zen Leaf 5 35

Zen Leaf

ONCE  - Nueva Fabrica Cruzcampo  129 37

La Factoría Cruzcampo

ONCE  - Via Paleocapa 8 1 39

Via Paleocapa Facade

ONCE  - Nimrod Levy2 41

Liderim offices

ONCE  - Vitanya Tower 4 43

Vitanya Tower

ONCE  - Busted 1 45

Busted Store

ONCE  - CulinaryON 9 47

CulinaryOn

ONCE  - Haidilao 8 49

Haidilao Marina Square

ONCE  -  60

Haluatko tietää Dektonin tarjoamista mahdollisuuksista rakennusten julkisivumateriaalina?

ONCE  - arrow right circulo@3x 1 62

Ota meihin yhteyttä!

Jos haluat saada ilmaisen näytteen tai räätälöityä neuvontaa, täytä lomake.