Cosentino Flagship Project

A Dekton-cladded robotic plant

Domus Arquitectura – Paz Fernández Ovejero

ONCE  - Unidad Central de Preparado ONCE 05 51

Location

Madrid, Spain

Material

Dekton

color

Soke | Soke Grip | Lunar | Keyla

Quantity

300 m2

Architecture / Design

Domus Arquitectura – Paz Fernández Ovejero

Application

End date

2019

Thickness

12 mm

Innovation begins with the surfaces

ONCE  - Unidad Central de Preparado ONCE 13 53
ONCE  - Unidad Central de Preparado ONCE 12 55

Customised cuts to ensure visual continuity

Do you need help with a project?

Contact our specialists for advice

Do you need help with a project?

Contact our specialists for advice

“On the walls, for the assembly of Dekton's pieces, we rely on large formats and lighting reflections to seek continuity”
Domus Arquitectos

Domus Arquitectos

Industrial functionality embracing design

ONCE  - Unidad Central de Preparado ONCE 36 58

Cosentino’s materials used in this project

Soke

Soke

Dekton
lunar_close_up

Lunar

Dekton
kelya

Kelya

Dekton

Related case studies

.

ONCE  - Busted 1 31

Busted Store

ONCE  - CulinaryON 9 33

CulinaryOn

ONCE  - Haidilao 8 35

Haidilao Marina Square

ONCE  - Pasteleria Glea 10 37

Patisserie Glea

ONCE  - Ritz Abama 7 39

Ritz-Carlton

ONCE  - H Pilsa Educa Aula countertop cladding 27jpg 41

Pilsa Educa

ONCE  - H Pilsa Educa Aula countertop cladding 27jpg 43

Pilsa Educa

ONCE  - Clientis 4 45

Clientis Bank

ONCE  - KSK Rottweil Schlater3 47

Kreissparkasse

ONCE  - Unidad Central de Preparado ONCE 05 49

ONCE

ONCE  -  60

Do you want to know the possibilities of Dekton in facades?

ONCE  - arrow right circulo@3x 1 62

Request a visit from a Cosentino representative

If you would like to receive a free sample or tailored advice, please fill in the form.