Cosentino Flagship Project

A Dekton-cladded robotic plant

Domus Arquitectura – Paz Fernández Ovejero

ONCE  - Unidad Central de Preparado ONCE 05 51

Location

Madrid, Spain

Material

Dekton

colour

Soke | Soke Grip | Lunar | Keyla

Quantity

300 m2

Architecture / Design

Domus Arquitectura – Paz Fernández Ovejero

Application

End date

2019

Thickness

12 mm

Innovation begins with the surfaces

ONCE  - Unidad Central de Preparado ONCE 13 53
ONCE  - Unidad Central de Preparado ONCE 12 55

Customised cuts to ensure visual continuity

Do you need help with a project?

Do you need help with a project?

“On the walls, for the assembly of Dekton's pieces, we rely on large formats and lighting reflections to seek continuity”
Domus Arquitectos

Domus Arquitectos

Industrial functionality embracing design

ONCE  - Unidad Central de Preparado ONCE 36 58

Cosentino’s materials used in this project

Soke

Soke

DEKTON
lunar_close_up

Lunar

DEKTON
kelya

Kelya

DEKTON

Related case studies

.

ONCE  - Bank of Buffalo 32 31

Bank of Buffalo

ONCE  - Nippon Express 6 33

Nippon Express

ONCE  - Zen Leaf 5 35

Zen Leaf

ONCE  - Nueva Fabrica Cruzcampo  129 37

La Factoría Cruzcampo

ONCE  - Via Paleocapa 8 1 39

Via Paleocapa Facade

ONCE  - Nimrod Levy2 41

Liderim offices

ONCE  - Vitanya Tower 4 43

Vitanya Tower

ONCE  - Busted 1 45

Busted Store

ONCE  - CulinaryON 9 47

CulinaryOn

ONCE  - Haidilao 8 49

Haidilao Marina Square

ONCE  -  60

Do you want to know the possibilities of Dekton in facades?

ONCE  - arrow right circulo@3x 1 62

Contact us!

If you would like to receive a free sample or tailored advice, please fill in the form.