Cosentino Flagship Project

A Dekton-cladded robotic plant

Domus Arquitectura – Paz Fernández Ovejero

ONCE  - Unidad Central de Preparado ONCE 05 45

Location

Madrid, Spain

Material

Dekton

colour

Soke | Soke Grip | Lunar | Keyla

Quantity

300 m2

Architecture / Design

Domus Arquitectura – Paz Fernández Ovejero

Application

End date

2019

Thickness

12 mm

Innovation begins with the surfaces

ONCE  - Unidad Central de Preparado ONCE 13 47
ONCE  - Unidad Central de Preparado ONCE 12 49

Customised cuts to ensure visual continuity

Do you need help with a project?

Contact our specialists for advice

Do you need help with a project?

Contact our specialists for advice

“On the walls, for the assembly of Dekton's pieces, we rely on large formats and lighting reflections to seek continuity”
Domus Arquitectos

Domus Arquitectos

Industrial functionality embracing design

ONCE  - Unidad Central de Preparado ONCE 36 52

Cosentino’s materials used in this project

Soke

Soke

DEKTON
lunar_close_up

Lunar

DEKTON
kelya

Kelya

DEKTON

Related case studies

.

ONCE  - KSK Rottweil Schlater3 31

Kreissparkasse

ONCE  - Unidad Central de Preparado ONCE 05 33

ONCE

ONCE  - Bernardus golf and memories Restaurant Noble Kitchen Cromvoirt 6 35

Bernardus

ONCE  - Dekton Wall 1 37

The wall

ONCE  - clubhouse 1 39

Tenah Merah

ONCE  - Auchan Dekton 32 41

Auchan

ONCE  - One South 1 43

One South County

ONCE  -  54

Do you want to know the possibilities of Dekton in facades?

ONCE  - arrow right circulo@3x 1 56

Contact us!

If you would like to receive a free sample or customised advice, please fill in the form.