Cosentino Flagship Project

A Dekton-cladded robotic plant

Domus Arquitectura – Paz Fernández Ovejero

ONCE  - Unidad Central de Preparado ONCE 05 42

Location

Madrid, Spain

Material

Dekton

colour

Soke | Soke Grip | Lunar | Keyla

Quantity

300 m2

Architecture / Design

Domus Arquitectura – Paz Fernández Ovejero

Application

End date

2019

Thickness

12 mm

Innovation begins with the surfaces

ONCE  - Unidad Central de Preparado ONCE 13 44
ONCE  - Unidad Central de Preparado ONCE 12 46

Customised cuts to ensure visual continuity

Do you need help with a project?

Do you need help with a project?

“On the walls, for the assembly of Dekton's pieces, we rely on large formats and lighting reflections to seek continuity”
Domus Arquitectos

Domus Arquitectos

Industrial functionality embracing design

ONCE  - Unidad Central de Preparado ONCE 36 49

Cosentino’s materials used in this project

Soke

Soke

DEKTON
lunar_close_up

Lunar

DEKTON
kelya

Kelya

DEKTON

Related case studies

.

ONCE  - Unidad Central de Preparado ONCE 05 30

ONCE

ONCE  - Bernardus golf and memories Restaurant Noble Kitchen Cromvoirt 6 32

Bernardus

ONCE  - Dekton Wall 1 34

The wall

ONCE  - clubhouse 1 36

Tenah Merah

ONCE  - Auchan Dekton 32 38

Auchan

ONCE  - One South 1 40

One South County

ONCE  -  51

Do you want to know the possibilities of Dekton in facades?

ONCE  - arrow right circulo@3x 1 53

Contact us!

If you would like to receive a free sample or tailored advice, please fill in the form.